-
23
-
model test report of a 50,000 ton heavy lift ship as a seabased intermediate transfer station(525.83kb).pdf
- model test report of a 50,000 ton heavy lift ship as a seabased intermediate transfer station(525.83kb)
-
-
5
-
Model 3.0 Ton (6,000 lbs) RP- 6KC Paint Can Crusher.pdf
- Model 3.0 Ton (6,000 lbs) RP- 6KC Paint Can Crusher
-
-
6
-
technical research for undocking scheme on the horizontal slipway for towing the 15,000 ton launching weight bulk-carrier.pdf
- technical research for undocking scheme on the horizontal slipway for towing the 15,000 ton launching weight bulk-carrier
-
-
5
-
连云港港30万吨级航道工程可行性研究综述 Review of Feasibility Study on 300 000-ton Waterway Project in Lianyungang Port.pdf
- 连云港港30万吨级航道工程可行性研究综述 Review of Feasibility Study on 300 000-ton Waterway Project in Lianyungang Port
-
-
7
-
discussion on the method for determining the harbor channel design width - take the proposed 250,000 ton waterway of panjin harbor for instance.pdf
- discussion on the method for determining the harbor channel design width - take the proposed 250,000 ton waterway of panjin harbor for instance
-
-
15
-
system integration and innovation of operating 20,000-ton combined heavy-haul train on dato.pdf
- system integration and innovation of operating 20,000-ton combined heavy-haul train on dato
-
-
2
-
The production of a ton of paper requires 17 trees, 7,000 gallons.doc
- The production of a ton of paper requires 17 trees, 7,000 gallons
-
-
8
-
3 TON (6,000 LBS.) JACK STANDS WITH LASER - Lowe´s.pdf
- 3 TON (6,000 LBS.) JACK STANDS WITH LASER - Lowe´s
-
-
1
-
Submerged foundations for 100,000 ton oil tanks 16F, 2T. PROC. INST. ENGRS. V54, MAY, 1973, P291-305.pdf
- Submerged foundations for 100,000 ton oil tanks 16F, 2T. PROC. INST. ENGRS. V54, MAY, 1973, P291–305
-
-
1
-
China's First 300,000-ton FPSO Put into Service.pdf
- China's First 300,000-ton FPSO Put into Service
-
向豆丁求助:有没有000-ton?