-
3
-
岷、横江来水对向家坝水文站顶托影响分析 Analysis on backwater effect of incoming water from Minjiang River and Hengjiang River on Xiangjiaba Hydrological Station.pdf
- 江Yangtze River Vol. 45,No. 12June, 2014收稿日期:2013 -04 -12作者简介:吴 垠,男,工程师,主要从事水文水资源及水文预报方面的工作。 mail:
-
-
6
-
基于水声学的长江上游向家坝至宜宾江段鱼类空间分布特征 surveys on spatial distribution of fishes based on hydroacoustics from xiangjiaba dam to yibin reach of the upper yangtze river.pdf
- 畅44No 畅2014 收稿日期:2012 -12 -27; 修订日期: 2013 -08 -13资助项目: 中国水产科学研究院基本科研业务费(2012A0103); 农业部 -中国长江三峡集团公司
-
-
7
-
ABB - THE XIANGJIABA-SHANGHAI 800KV UHVDC PROJECT.pdf
- Xiangjiaba-Shanghai800kV UHVDC project Status specialaspects V. F. Lescale, U. strm W. Ma, Z. Liu AB
-
-
5
-
(论文)向家坝水电站坝基渗控体系设计与动态优化调整 Design of seepage control system of Xiangjiaba Hydropower Station and its dynamic optimization and adjustment.pdf
- 人 民 长 江Yangtze River Vol.46,No.2Jan., 2015收稿日期:2014 -10 -21作者简介:樊 凯,男,工程师,研究方向为坝基加固处理和防渗工程设计与施工。 -
-
-
6
-
长江上游两座在建巨型水电站水轮机总体技术特性评析 Analysis of overall technical features of hydro turbines of Xiluodu project and Xiangjiaba project.pdf
- OURNA LECTRIC NGINE ER ING 1.中国长江三峡 北宜昌443002 ;2.清华 大学 热能 长江上游河段一金沙江 ,正在兴建两座 巨型电站 电站共装有单机容量 700MW 以上
-
-
2
-
ABB - XIANGJIABA - SHANGHAI 卤800 KV UHVDC TRANSMISSION PROJE.pdf
- Shanghai800 kV UHVDC transmission project world’slargest transmission link breakthroughtechnology Th
-
-
10
-
Creep failure mode and criterion of Xiangjiaba sandstone:蠕变失效模式和向家坝砂岩准则.pdf
- J.Cent. South Univ. (2012) 19: 3572–3581 DOI: 10.1007/s11771-012-1445-z Creep failure mode Xiangjiab
-
-
13
-
Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm英文资料.pdf
- Short-termhydro generation scheduling Xiangjiabacascadehydropower stations using improved binary-rea
-
-
9
-
Research and design of the main equipments and structure of Xiangjiaba shiplift.pdf
- Research and design of the main equipments and structure of Xiangjiaba shipliftof,and,the,The,main,Main,MAIN,AND
-
向豆丁求助:有没有Xiangjiaba?